it - fr - en - de

Updated situation

ROAD CONDITIONS AND WORK SITES

From Wednesday, June 28, 2017 at 8.00 until Friday, June 30, 2017 at 17.00
Motorway slip road: one way traffic system with traffic light.
from km 2.300 to km 2.500

From Monday, April 27, 2020 until Monday, May 25, 2020
Motorway slip road: one way traffic system with traffic light.
from km 5+650 to km 6+050

NIGHTIME TRAFIC RESTRICTIONS

The Great St. Bernard Tunnel is planning extensive works to renew the ventilation ceilings. These works will not affect daytime traffic (6 a.m. to 10 p.m.). From 9 October 2023 to 22 Mars 2024, from 10 p.m. to 6 a.m. (except during weekends and Christmas holidays), transit will only be permitted for vehicles less than 3.00 metres high. (Category B1).

Latest update Tuesday, October 3, 2023 - 21.54

  Weather Roads Road conditions Temperature

ITALIA

Clear Dry road
surface
Normal
traffic

11°

SUISSE

Clear Dry road
surface
Normal
traffic

9.7 °

Snow tires requirements

From October 15th  to April 15th on Aosta Valley roads winter tires or snow chains on board are required.

Weather, webcams, traffic

Operating companies

Info 24h / 24h

Sala Controllo ITALIA
+39 0165 78 09 02


Salle Contrôle SUISSE
+41 (0)27 788 44 00

SISEX SA
Italia:11010 - St-Rhémy-en-Bosses
Telefono +39 0165 78 09 49

Suisse:1946 Bourg-Saint-Pierre
Téléphone +41 (0) 27 787 12 06
Fax +41 (0) 27 787 12 19
E-mail: info@letunnel.com

Valid XHTML 1.0 Strict  •  Valid CSS!  •  VisaMultimedia - Grafica | Internet | Multimedia | Video | Fotografia  •  Cloud Hosting Provider - HEXTRA